Is Your Facility One Of Them?
Most Cooling Towers Waste 40% On Treatment Costs
See what optimized treatment could save your facility
40%
Water
Savings
40%
Chemical
Savings
20%
Energy
Savings
Calculate My Savings

Filter Press and Dewatering ROI Calculators

Use our Return On Investment (ROI) calculators to determine if a Matec process is the right solution for your operation.

Filter Press and Dewatering ROI Calculators below help our customers explore possible costs of a Matec filter press and dewatering system. Each of these calculators will ask you to fill in just a few numbers that tell us a little about your current operation. After submitting, the calculator will give you an estimate of the cost for a new Matec operation.  Please contact us once you determine if we are a fit for your business!

Ready Mix: Water Recycling Cost Calculator

Mining: Filter Press Cost Calculator

Matec Resources

Most facilities skip the most important step before boiler shutdown. Learn the 2-3 week blowdown protocol that prevents oxygen pitting, scale buildup, and a costly fall startup.
Closed loops don't sit still over winter. Learn the 5 problems building in your chilled water loop right now — and the water test parameters that reveal them before equipment fails.
Most cooling towers waste $12,000–$25,000 per year because CoC is never optimized. Learn what cycles of concentration is, how to calculate it, and how to fix it.